Begin: Monday, August 24th, 2020
End: Monday, August 31st, 2020
Building(s) or Area(s) Impacted: Path along the north side of the Millrace between Gallery Walk and Riverfront Parkway
Scope: The path along the north side of the Millrace between Gallery Walk and Riverfront Parkway will be closed to all pedestrian and bike traffic beginning Monday 8/24 for 1 week. Grade work to tie-in the Knight Campus bridges over the Millrace will be taking place during this closure.
Extra Notes: Gallery Walk will remain open to the north of the pathway and the detour route will be the gravel road north of the Urban Farm.
Work Performed By: Hoffman Construction
Contact: Jenna Shope, CPFM Owner’s Representative, 541-346-2281