North Campus Temporary Closure of Railroad Bridge Throughway and Safety Advisory

The new parking structure under construction on Millrace Dr. requires temporary closure of the throughway under the railroad bridge. Bikes and pedestrians are being detoured along the gravel road by the greenhouse to connect with Gallery Way.

There have been reports of close calls between bikes and vehicles at the intersection circled below. If you drive in this area, please anticipate more bike and pedestrian traffic, in both directions, and adjust your driving accordingly. Thank you!

For questions or concerns, please contact Haily Griffith, SRS Occ. Health & safety Manager, 541-346-2962 or 541-520-3677.