Portland Artist & Artisan Plaza. Where community and creativity comes to live.
Let me walk you through the project PAAP, this is what you would see when you arrive with the new Orange line, from here, you see the Community Hub building, and now we enter from the south into the Grand…
Midterm Comments
[embeddoc url=”https://blogs.uoregon.edu/arch586s16cheng/files/2016/05/0502MRPresentationSS-1z4gil3.pdf” download=”all” viewer=”google”] During the midwives, the most asked question was about the structure. Since I am dedicated to use CLP as the main structure for my building, I am also facing many challenges on my canopy. The cantilever…
Mid-Final Reivew 2016winter
[embeddoc url=”https://blogs.uoregon.edu/arch586s16cheng/files/2016/03/0310-Final-Board-pxmi4d.pdf” download=”all” viewer=”google”] Here’s my final presentation for the end of Winter 2016. The comments that I feel will be useful for the next phase are listed below: Bigger Programs in the workshop area, probably need 3 times more…
Mid Review Update
[embeddoc url=”https://blogs.uoregon.edu/arch586s16cheng/files/2016/02/MidReivew-Board-2dozn80.pdf” download=”all” viewer=”google”] The project started form the Urban Scale, following the Green Loop Development, the project grow in phases. The first phase is the Industrial Maker’s Plaza (IMP), with the District Hall and Maker’s Market. The project takes…
Re think Wood
Re-think Wood, A little preview for the CLT presentation for Wednesday.
Progress after Mid-review I
2050 Site Analyze 2040 Green Loop Plan The two links above are the material shown at the Mid-review. The review went well and I gain a lot of knowledge on how to refine and approach the design project more thoughtfully….
2050 Plan for Industrial Sanctuary – v1
Proposed development phase followed with the 2040 Green Loop Plan [embeddoc url=”https://blogs.uoregon.edu/arch586s16cheng/files/2016/01/2050-phase-26l1nm7.pdf” download=”all” viewer=”google”]
Growth of the Loop – Biomimicry v1.1
[embeddoc url=”https://blogs.uoregon.edu/arch586s16cheng/files/2016/01/2040GreenLoopPlanS-qgr1d7.pdf” download=”all” viewer=”google”] The three stages of the mold growth is: 1. Center 2. Spread the Root 3. Growth Based on the stages, I propose this way to achieve the goal of Green Loop in the year of 2040….
Biomimicry, the growth of Mold to Urbanization
Mold Time Lapse This is my subject for boimimicry study. The Mold can grow in many places many condition, this must be a way to efficiently spread the nutrition and how we can apply this growth to urbanization seem to…