UPDATE 4/18: The first hour (from 6am to 7am), ALL of Esslinger, and the NW corner of the Student REC Center of will be without power. After 7am, the noted spaces for Esslinger will continue to be offline until 4pm.
Begin: Saturday, April 23rd 30th, 2022 at 6:00 am
End: Saturday, April 23rd 30th, 2022 at 4:00 pm
Building(s) or Area(s) Impacted: Esslinger Hall & NW Corner of SRC
Scope: Electrical Panel C1 and C2 will be shut down to replace them with new panels. The first hour (from 6am to 7am), ALL of Esslinger, and the NW corner of the Student REC Center of will be without power. After 7am, the noted spaces for Esslinger will continue to be offline until 4pm.
Services Impacted: Power will be off on Saturday to the NW corner of the SRC and all of Esslinger.
Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on. A power surge can corrupt the clone files in the machines and change preconfigured settings.
Work Performed By: Mortenson Construction / EC Electric
Contact: Tim Allenbaugh, CPFM Owner’s Representative, 541-346-8214