Begin: Monday, December 15, 2025, at 7:00 am
End: Monday, December 15, 2025, at 12:00 noon
Building(s) or Area(s) Affected: Onyx Bridge rooms 072-098 and related tunnel
Scope: The electrical panels will be shut down to T2 in the tunnel and to A & E in Onyx Bridge so a junction box can be relocated. Work to move the junction box should take about 4 hours max.
Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on. A power surge can corrupt the clone files in the machines and change preconfigured settings. For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu. For non-copier questions, please reach out to the contact person listed below.
Work Performed By: OEG
Contact: Glen Macdonald, CPFM Owner’s Representative, 541-346-8201
Current construction and impacts information can be found on the UO Maps site.
