7/26/24 Pacific Hall Rooms 008 and 013 Concrete Core Drilling

Begin:  Friday, July 26, 2024, at 8:00 am

End:      Friday, July 26, 2024, at 1:00 pm

Building(s) or Area(s) Affected:  Pacific Hall

Scope:  Due to a lab remodel in Pacific 013, the general contractor will be performing concrete core drilling.  Three holes will be drilled – one in the floor of Pacific 013 and 2 holes in the sub-basement under Pacific 008.

Services Impacted:  Noise is to be expected during this time affecting rooms 7, 8, 9, 10, 12, 13, 110, 111, 112, 113

Work Performed By:  Luna Design and Construction

ContactDavid Mason, CPFM Owner’s Representative, 541-346-5679

Current construction and impacts information can be found on the UO Maps site.

Overhead image of map showing areas affected by core drilling in Pacific Hall rooms 8 and 13 on 7/26/24