UPDATE:
While a portion of this work was completed on August 30th (scraping and prepping the floor), the installation of the flooring as noted in the original notice will occur on Monday, September 11th, and Tuesday, September 12th.
Begin: Wednesday, August 30, 2023, at 7:00 am
End: Wednesday, August 30, Tuesday, September 12, 2023, at 4:00 pm
Building(s) or Area(s) Affected: Fenton Hall
Scope: The small hallway on the 3rd floor that connects the Main building to the Stacks (hallways H314 and H315 – now merged into one space), is receiving new flooring.
Services Impacted:
- While the floor glue is being spread and the flooring is installed, the hallway will have limited access.
- This will affect access to the roof and office 315.
Special Instructions: Temporary accommodations can be made if access is needed.
Work Performed By: GBC Construction / Rubenstein’s
Contact: Tim Allenbaugh, CPFM Owner’s Representative, 541-346-8214