In the early hours of June 5, 2023, a leak occurred from a water line in Onyx Bridge, Cold Room 485. The leak impacted several spaces on all floors of Onyx Bridge, and the southern portion of Cascade Annex East. Thanks to the quick work of CPFM staff, the building impacts were contained and limited to cabinetry, carpet, ceiling tiles, and/or wall finishes in the rooms listed below:
Onyx Bridge: 169, 170, H261, 265, 269, H361, 368, and 369.
Cascade Annex East: V150, 160, 160A, and 160B
The University has retained a mitigation contractor, Belfor, to provide mitigation services for all of the affected spaces. Our current mitigation strategy will be to dry out finishes in place where possible, with minimal demolition. This will include the use of dehumidification equipment and large fans strategically placed throughout affected areas. The equipment will generate heat and a significant amount of noise. EHS will oversee the dry out phase of the mitigation. Belfor began setup of mitigation equipment in the affected spaces today (June 7, 2023) and dry out status will be re-evaluated later this week. Once mitigation has been completed, the spaces will be reassembled by CPFM staff as needed.
Starting tomorrow (June 8, 2023), BELFOR will demolish the impacted and failing ceiling tiles in Hallway H261 outside of Rooms 268/269. This work will be performed within a negative pressure enclosure, and the containment will be constructed such that half of the hallway will be passable at all times. This is anticipated to be completed by end of day.
Please feel free to contact me if you have any questions or concerns about the mitigation phase of this incident. If any non-building related items were damaged as a result of this incident, contact Risk Management at 541-346-8316.
Thanks,
Nate Ferguson
Building Environmental Sciences Coordinator
http://safety.uoregon.edu/
Safety & Risk Services | University of Oregon
1260 University of Oregon | Eugene, OR 97403-1260
Office: 541.346.2901 | Mobile: 530.902.0109