3/15/23 – 5/30/23 Lokey Labs Emergency Fume Hood Shutdown

UPDATE: 
Repairs and equipment replacement are scheduled for Tuesday, May 30th.
Work will be performed by EC Electric and Lewis Construction.

 

Begin:  Wednesday, March 15, 2023 – effective immediately

End:      Unknown    Tuesday, May 30, 2023

Building(s) or Area(s) Affected:  Lokey Labs

Scope: Emergency shutdown of all fume hoods.  The LEF1 fan, which provides exhaust air for fume hoods in Lokey Labs, is down.  There is some minimal airflow in the exhaust system, however the current level of ventilation is below requirements and all fume hoods should be considered inoperable.  An update will be sent when more information is available.

Services Impacted:  Fume hoods are out of service.

Special InstructionsFume hood sashes should be closed and containers within the fume hoods sealed.

Work Performed By:  CPFM Facilities

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.