UPDATE
The Huestis fume hood exhaust fans are back to normal operation.
Begin: January 12, 2021 at 7:00 am
End: January 13, 2021 at 5:00 pm
Building(s) or Area(s) Impacted: Huestis
Scope: To resolve issues with the Lead/Lag rotation on the fume hood exhaust fans, an updated Sequence of Operation will need to be implemented. This update will require changes to the existing program logic as well as a series of tests to verify correct function.
The fans will be cycled on and off throughout the testing process. Regardless of the presence of negative air flow in the fume hoods, the fume hoods should be considered out of service through the duration of this shutdown.
Services Impacted: This will impact all fume hoods on all floors.
Extra Notes: An update to this notice will be sent out once the testing is complete and the fume hood exhaust system is back to normal operation.
Special Instructions: Fume hood sashes should be closed and containers within the fume hoods should be sealed.
Work Performed By: Siemens
Contact: Stacy Breaux, CPFM FS Bldg Automation Sys Field Supr, 541-521-5376