Klamath Hall Supply Air and Fire Alarm Shutdown 3/23/20

Date Revision:  This shutdown has been moved to Monday, March 23rd.

 

BeginSaturday, March 14th, 2020 at 6:00 am  Monday, March 23rd, 2020 at 6:00 am

End: Saturday, March 14th, 2020 at 3:00 pm  Monday, March 23rd, 2020 at 3:00 pm

Building or Area Impacted:  Klamath Hall

Scope:  Renovation contractor needs to revise power source to electrical panels.

Services Impacted:  This requires shutting down supply air to level 2 and the building’s fire alarm.

Extra Notes:  Fire watch will be conducted during this time.

Work Performed By:  Lease Crutcher Lewis

ContactDenise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258