Begin: Friday, December 20th, 2019 at 6:00 am
End: Friday, December 20th, 2019 at 12:00 noon
Building Impacted: Allen Hall
Scope: 2nd Floor fire sprinkler system will need to be shut down to move a sprinkler head associated with the installation of a new fan coil unit. This is an unexpected shutdown due to adjustments in design. Work to take place at office suite 216.
Services Impacted: 2nd Floor Fire Sprinkler System will be offline. The building will be monitored during this time.
Contact: Gene Mowery, Owner’s Representative, 541-346-5593