Lewis Integrative Science Building Sidewalk Closure Through 9/9/19

Update 9/6/19:

The sidewalk closure has been extended and is expected to be completed on September 9th.

As part of the ongoing Knight Campus Skybridge construction, the current sidewalk closure on Franklin Blvd by Lewis Integrative Science (LISB) will remain in effect through September 6th 9th, 2019. The rest of the sidewalk along Franklin Blvd by Streisinger, Klamath, and Onyx Bridge will remain open. However, the sidewalk on the North side of Franklin Blvd will remain closed during the construction of Knight Campus.

For questions or concerns, please contact Darin Dehle at 541-346-2282 or ddehle@uoregon.edu.