Facilities Liaisons,
In order to facilitate the structural design of the new elevator scheduled to be constructed in summer 2020 in Friendly Hall, we need to cut an access hole in the ceiling of rooms 109 and 217. This work needs to be done before 8/13 to maintain the design schedule. I am trying to schedule an asbestos contractor to do this work. I am hoping to schedule this for the coming weekend 8/10 or 8/11.
These rooms will be usable when we are finished with this work. Some ceiling tiles will need to be replaced in conference room 109. I am working to determine if we have any stock on-site or if replacement tiles need to be ordered.
Pre-communication was sent to Cathy Soutar.
I apologize for the short notice but and appreciate your patience.
Bruce Budzik
Small Projects Manager CPFM Design and Construction
bbbudzik@uoregon.edu | 541-346-8834