Physical Plant Warehouse and Shop HVAC System Shutdown 5/31/19 – 6/3/19; 6/7/19 – 6/10/19

On the following dates and times, portions of the HVAC system that affect the entire building may be shut down for painting purposes:

  • Fri., May 31, at 3:00 p.m. – Mon., June 3, at 7:00 a.m.
  • Fri., June 7 at 3:00 p.m. – Mon., June 10 at 7:00 a.m.

If you have any questions or concerns, please contact CPFM Design and Construction Project Manager Tim Allenbaugh at timallen@uoregon.edu or 541-346-8214.