Building Occupants,
On Tuesday, October 30 from 3:00 am – 8:00 am contractors will shut down power that services the second floor of Klamath Hall. The work is required to bring additional power into the Media Kitchen for the new Autoclave being installed.
This work is part of Capital Project CP17-131 – Klamath Autoclave Install.
Rooms impacted:
H202, H207, H269, H208, H202, H209, H206,
215G
223, 225, 229, 228A, 229A 225A
233, 2335A, 234, 230, 232, 237, 239, 239A 230
241, 245, 249, 249A, 249B, 249C
255B,257,255C, 255B, 255, 255A
V262, 261, 262, 262B, 262A, 261,
275, 274, 273, 271, 270, 270C, 270, 270C, 270, 270E, 270F, 270G, 270A, 272, 272A
288,
Systems on the 2nd floor that will be impacted are non-emergency lighting, electrical outlets, network services, and dedicated HVAC equipment in some of the spaces listed above.
For questions or concerns please contact CPFM Design and Construction Project Manager Colin Brennan at brennan@uoreogon.edu or 541.654.2972
[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2018/10/Klamath-Electrical-Impact-Oct-30-ShutDown-2-1yh3el2.pdf” download=”all” viewer=”google” ]