5/1-9/14: Roof Antenna Installations At LISB, Pacific, Walton, Earl, Computing Center, Miller, LBC – Anstett, PLC, JSMA, Knight Library

Campus Community,

On May 1, 2018, Verizon will begin a project to install small (2′ tall) DAS Roof antennas to 10 different buildings on campus. The work will begin with LISB on May 1, and prep will start in Pacific, Walton and Earl. The work will continue steadily with the Computing Center, Miller, the Anstett wing of LBC, PLC lower roof, JSMA, and Knight Library, until complete in early September.

To prepare for this work, items will be stored in buildings starting April 17, 2018 . Installers will access the roof of each of the affected building, and some basements, along with various other IT or storage rooms. No shut-downs will occur, however one day of drilling on the roof or core drilling inside walls may be heard in each building. In some cases scissor lifts will be used to get to the roof. Please see attached diagrams for reference to affected work areas and boom/scissor-lift locations.

If you have questions or concerns, please contact Jana Gerow, Owner’s Representative with CPFM Design & Construction at (541) 346-8317.