3/19 – 3/23: McKenzie Suite 275 Abatement

Building Occupants of McKenzie Suite 275:

Beginning Monday, March 19th at 4:00 pm until Friday, March 23rd, a contractor will be performing asbestos abatement in Suite 275.  The contractor has requested that all the HVAC supply/returns in the suite to be shut off so they can cover up the vents with plastic.

Work will begin at approximately 4:00 pm and they will work in the evening.  We expect them to finish by Friday but it could end sooner, TBD.
Abatement work will be performed by Rose City.

For questions or concerns about how this may impact your area, contact Theo Davis, Campus Planning and Facilities Management (CPFM) Design and Construction at 346-1012.

[embeddoc url=”https://blogs.uoregon.edu/cpfmnotifications/files/2018/03/Mckenzie-275-Floor-Plan-area-of-work-5-1xpx2r3.pdf” download=”all” viewer=”google” ]