UPDATE 8/12: The air conditioning is back online.
UPDATE 8/2: Computing Center second floor A/C is still offline. CPFM Mechanical Shop is picking up the replacement part today and plan to start repairs this week. They expect the issue to be resolved by the 12th.
UPDATE 7/13: The second floor HVAC is still offline. The occupants will experience warmer room temperatures. The CPFM Mechanical Shop is in the process of planning the repair.
Begin: Friday, July 1st, 2022
End: Unknown August 12, 2022
Building Impacted: Computing Center
Scope: Emergency air conditioning shutdown due to a damaged chilled water coil in the second floor air handler. It was necessary to isolate the coil to prevent water from leaking onto the first floor electrical equipment.
Services Impacted: The second floor rooms will not have air conditioning until the leak is repaired. The air conditioning to the server rooms is not impacted by this outage.
Work Performed By: CPFM Mechanical Shop
Contact: Kyle Harshbarger, CPFM Mechanical and Plumbing Shop Manager, 541-346-2055