Begin: Monday, March 21st, 2022 at 7:00 am
End: Monday, March 21st, 2022 at 11:00 am
Building(s) or Area(s) Impacted: Huestis and Lokey Labs
Scope: There will be a building wide electrical shutdown the Monday of Spring Break.
Services Impacted:
- In Huestis Hall, all systems and equipment not on standby power will be affected and unavailable.
- In Lokey Labs, all regular electric outlets and equipment connected to normal power will be affected and unavailable.
Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on. A power surge can corrupt the clone files in the machines and change preconfigured settings.
Work Performed By: Mortenson Construction / EC Electric
Contact: Martina Oxoby, CPFM Owner’s Representative, 541-346-5880