11/14/25 Lewis Integrative Science Building EHS Material Transportation Advisory

Begin:  Friday, November 14, 2025, at 8:30 am

End:      Friday, November 14, 2025, at 10:30 am

Building(s) or Area(s) Affected:  Lewis Integrative Science Building, Willamette Hall, Klamath Hall, Onyx Bridge, Onyx Bridge Dock

Scope:  Environmental Health and Safety and the Civil Support Team will be running a joint exercise in which a bottle from the Lewis Integrative Science Building basement will be assessed, removed from the building, and then transported off-site.  Per the map below, the bottle will be transported along the route as marked in purple.  Environmental Health and Safety staff will be on-site for the activity, with UOPD staff available on-call.

Services Impacted:

  • Expect to see officers in uniform and others in personal protective equipment and EHS team members.
  • Emergency egress from adjacent buildings will remain available, as will fire lane access for emergency response vehicles.
  • Temporary vehicle barriers will be positioned across the Onyx Bridge Dock and the connecting fire lanes.

Work Performed By:  Environmental Health and Safety, and Civil Support Team

ContactBen Bythell, SRS Chemical Safety Officer/Hazardous Materials Manager, 541-346-0371

Current construction and impacts information can be found on the UO Maps site.