Begin: Monday, August 12, 2024, at 8:00 am
End: Friday, August 16, 2024, at 5:00 pm
Building(s) or Area(s) Affected: Central Kitchen, Museum Natural and Cultural History facilities, and residential family housing
Scope: Geotech will be working in the east campus area in the blocks bounded by Columbia Street, 17th Ave, Moon Lee Lane, and 19th. A total of 6 borings will take place, be aware that there will be a small drill rig in the area. This work will take 1 week as they move from location to location.
Services Impacted: Drilling related noises can be expected.
Work Performed By: GRI Geotechnical Services
Contact: George Bleekman, CPFM Owner’s Representative, 541-346-2625
Current construction and impacts information can be found on the UO Maps site.