UPDATE 11/07/23:
The pump has been replaced and is now operational. Please remember to turn off lab vacuums when not in use to avoid excessive load on the pump. Thank you.
UPDATE 9/12/23:
The rooftop vacuum that affects only the 3rd floor labs, needs to be removed and sent out for repairs.
It is unknown how long before the vacuum will be returned to service.
An update will be sent at a later date.
(The other rooftop vacuum is still operational and not affected.)
Begin: Monday, September 11, 2023 – effective immediately
End: Unknown November 7, 2023
Building(s) or Area(s) Affected: Klamath Hall
Scope: One of the rooftop vacuums has stopped working. A contractor is being called in to make the repairs. A notice will be sent when service has been restored.
Services Impacted: Unknown which lab vacuums will be offline.
Work Performed By: Contractor
Contact: Work Control Center, Campus Planning and Facilities Management, 541-346-2319
Current construction and impacts information can be found on the UO Maps site.