5/30/23 Prince Lucien Campbell Hall First Floor Fire Sprinkler Shutdown

REVISED:
The work has been rescheduled by the contractor to Tuesday, May 30th

 

Begin: Friday, May 26th, 2023, at 7:00 am  Tuesday, May 30th, 2023, at 7:00 am

End:      Friday, May 26th, 2023, at 4:00 pm  Tuesday, May 30th, 2023, at 4:00 pm

Building(s) or Area(s) Affected:  Prince Lucien Campbell Hall

Scope: Due to ongoing reconfigurations of the fire sprinkler in room 72, we need to shut down the first-floor fire sprinkler system to re-route sprinkler lines

Services Impacted:  First floor sprinkler system will be down for the day.

Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Work Performed By:  GBC Construction/ Harvey and Price

ContactTim Allenbaugh, CPFM Owner’s Representative, 541-346-821

Current construction and impacts information can be found on the UO Maps site.