REVISED DATE:
The date has been changed to the following day, Tuesday, January 17.
Begin: Monday, January 16, 2023, at 7:00 am Tuesday, January 17, 2023, at 7:00 am
End: Monday, January 16, 2023, at 3:00 pm Tuesday, January 17, 2023, at 3:00 pm
Building(s) or Area(s) Affected: Prince Lucien Campbell 3rd floor
Scope:
- In association with the remodeling work taking place in rooms 348 and 353, IES will put the fire panel in test mode for the third floor.
- Harvey & Price will then install fire sprinkler piping in the ceiling space of room 348.
- Once piping is installed and tested, IES will put the fire panel back on line.
- GBC Construction will provide fire watch personnel for the third floor during this time.
Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.
Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations
Work Performed By: EIS, Harvey & Price, GBC Construction
Contact: Gene Mowery, CPFM Owner’s Representative, 541-346-5593 or 541-799-4016
Current construction and impacts information can be found on the UO Maps site.