12/19/22 Feeder 1 Electrical Shutdown

Begin:  Monday, December 19th, 2022, at 7:00 am

End:    Monday, December 19th, 2022, at 8:00 am

Buildings:  Unthank Hall, Bean Hall, Global Scholars, Kalapuya Ilihi, Ford Alumni, Matt Knight Arena.

Scope:  Feeder 1 will be shut down to connect the HWTP Phase 2 Project to campus power.

Services Impacted:

  • This will affect main power and elevators, however these buildings will be on standby power during this time.
  • This will not impact Hayward Field.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Oregon Electric Group and CPFM U&E

ContactGeorge Bleekman, CPFM Owner’s Representative, 541-346-2625

Current construction and impacts can be found on the UO Maps site.