10/26/22 Lawrence Hall Core Drilling Advisory

Begin:  Wednesday, October 26th, 2022 at 5:30 am

End:      Wednesday, October 26th, 2022 at 8:00 am

Building(s) or Area(s) Affected:  Lawrence Hall Lobby (L100) and Exterior Entry

Scope:  Three holes will be cored at the main south entry of Lawrence Hall to provide access under the concrete slab for geo tech analysis of the subsurface.

  • Two holes will be cored inside the Lobby (L100)
  • One hole will be cored outside under the covered entry area

Services Impacted:  Access to the doors will be affected but will remain open.  Noise from the drilling should be expected.

Work Performed By:  Cutting Edge Concrete

ContactLuke Helm, CPFM Owner’s Representative, 458-256-7622

To view current construction and impacts. visit UO Map.