5/5/22 Onyx Bridge 4th floor HVAC Advisory

Begin:  Thursday, May 5th, 2022 at 7:00 am

End:   Thursday, May 5th, 2022 at 5:00 pm

Building:   Onyx Bridge

Scope:  The HVAC system on the 4th  floor will be balanced tomorrow. Contractors will be entering into all spaces to adjust the system.

Services Impacted:  HVAC air supply will be offline to the 4th floor during this time.

Work Performed By:  Air Inc

ContactColin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972