5/14/22 Huestis Hall and Lokey Labs Electrical Shutdown

Begin:  May 14th, 2022 at 7:00 am

End:      May 14th, 2022 at 10:00 am

Building(s) or Area(s) Impacted:  Huestis Hall and Lokey Labs

Scope:  As part of the Huestis Hall Renovation project, the main electrical distribution panel will be shut down for installation of temp power panels and breakers.

Services Impacted:

  • In Huestis Hall, all systems and equipment connected to normal power will be affected and unavailable. Equipment on standby power will not be affected.
  • In Lokey Labs, all systems and equipment connected to normal power will be affected and unavailable. Equipment on standby power will not be affected.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.

Work Performed By:  Mortenson Construction / EC Electric

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880