Begin: March 14th, 2022 at 8:00 AM
End: March 18th, 2022 at 5:00 PM
Building(s) or Area(s) Impacted: Gerlinger Hall Sun Porch and surrounding area
Scope: New finish being applied to a wood floor in the Sun Porch. Although the finish material is listed as “Low Odor” with low chemical emissions there will likely be detectible odor in and around Gerlinger.
Work Performed By: Preferred Construction
Contact: David Mason, CPFM Owner’s Representative, 541-346-5679