Annual Autoclave Steam Generator Preventative Maintenance March 21-24, 2022

Begin:  Monday, March 21st, 2022 at 7:00 am

End:      Thursday, March 24th, 2022 at 4:00 pm

Building(s) or Area(s) Impacted:  Cascade Annex, Columbia Hall, Huestis Hall, Klamath Hall, Lewis Integrative Science Building (LISB), Onyx Bridge, Pacific Hall, Streisinger Hall, University Health Services, Volcanology, Willamette Hall, and Zebrafish International Resource Center (ZIRC)

Scope:  CPFM Utilities and Energy will be performing the annual preventative maintenance and an internal inspection of the autoclave steam generator

Services Impacted

·        The autoclave steam heat exchanger will be shut down.

·        Clean steam will be unavailable but chemically treated 60 psi steam will be cross connected and routed through the pipeline for the duration of the shutdown.

·        No building heat or hot water will be impacted.

Work Performed By:  CPFM Utilities and Energy with a Contractor

ContactKyle Wilson, CPFM Utilities Maintenance Manager, 541-346-2246