Begin: August 26th, 2021 at 6:00 AM
End: August 26th, 2021 at 12:00 PM
Building(s) or Area(s) Impacted: Human Physiology Tenant Improvement (Bowerman Sports Science Center) at Hayward Field
Scope: Electrical panel (NW-LPE) shutdown for metering controls work.
Services Impacted: Power to locations listed in attached photo.
Work Performed By: EC Electric and Siemens
Contact: Gene Mowery, CPFM Owner’s Representative, 541-346-5593