Begin: Tuesday, January 26th, 2021 at 8:00 am
End: Tuesday, January 26th, 2021 at 12:00 noon
Building(s) or Area(s) Impacted: Klamath Hall
Scope: An emergency chilled water shutdown is needed to investigate the cause of a check valve failure. The check valve will be removed and inspected and re-installed during the shutdown.
Services Impacted: Chilled water
Work Performed By: S2 Industrial
Contact: Kevin Waldrop, CPFM Facilities Engineer, 541-346-2315