REVISED to include Esslinger
Begin: Tuesday, December 15th, 2020 at 8:30 am
End: Tuesday, December 15th, 2020 at 5:00 pm
Building(s) or Area(s) Impacted: Student Recreation Center, Student Tennis Center, Esslinger
Scope: The normal 1500kva transformer has had several failed oil sample analysis. The transformer will be shut down for 8.5 hours while the contractor will processes the oil.
Services Impacted: Student Rec Center, the Student Tennis Center, and Esslinger will be without power.
Special Instructions: Please shut down all multi-function copier devices, as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when power is turned back on. A power surge can corrupt the clone files in the machines and can change preconfigured settings.
Work Performed By: CPFM U&E and Contractor
Contact: Rick Tabor, CPFM Interim Co-Dir Utilities and Facilities Management, 541-346-7511