Begin: Thursday, June 18th, 2020 at 7:30 am
End: Thursday, June 18th, 2020 at 9:00 am
Building(s) or Area(s) Impacted: Museum of Natural and Cultural History
Scope: We need to shut down the main electrical panel to install a new breaker for the chiller
Services Impacted: Entire building will be without power
Special Instructions: Please shut down all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when power is turned back on, a power surge can corrupt the clone files in the machines, and can change preconfigured settings.
Work Performed By: CPFM Facilities Electrical Support
Contact: Rob Berg, CPFM Facilities Electrical and Light Supervisor, 541-346-2313