Begin: Tuesday, March 24th, 2020 at 5:00 am
End: Tuesday, March 24th, 2020 at 10:00 am
Building or Area Impacted: Klamath Hall Room B003
Scope: Contractors need to install a new power source to an existing electrical panel that serves B003.
Services Impacted: Power to this room will be off for the duration of the shutdown.
Special Instructions: If applicable, please shut down all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when power is turned back on, a power surge can corrupt the clone files in the machines, and can change preconfigured settings.
Work Performed By: Lease Crutcher Lewis
Contact: Denise Stewart, CPFM Owner’s Representative, 541-346-2280 or 541-335-1258