North Campus Utilities Survey Advisory 3/16/20 – 8/7/20

UPDATE 7/20/2020: EWEB will be doing a geotechnical investigation that includes test pits in the area on 8/7.

Begin:  Monday, March 16th, 2020

End:      Friday, April 24th, 2020

Area Impacted:  North campus area (between railroad and Willamette River)

Scope:  EWEB will be surveying and verifying depths of their existing utilities that run through north campus.

Services Impacted:  Survey and potholing crews may be in the area intermittently.

Work Performed By:  EWEB

ContactSarah Follett, CPFM Facilities Engineer, 541-346-8264