Occupants may experience cooler than normal office and lab temperatures and observe a few minor leaks (water) and noises at heating water pipe unions, valves, and points of connection as system stabilize and heats back up to normal operating temperatures.
All physical repairs have been completed as of 5:30 pm on 7/18/18. CPFM Trades-persons will be refilling the entire heating water system on 7/19/18. Crews will be monitoring all floors and areas throughout the day as the system is being re-filled (with water only).
For questions or concerns please contact David Ward at rdward@uoregon.edu, 541-346-2303 (w) or 541-632-2740 (cell).
_____________________________________________________________________________________________________________________
Building Heat will be offline on July 17, 2018 from 8:00 am – 4:00 pm while contractors work on the system. Temperatures will be a few degrees cooler in the building. Price Science Commons will not be impacted.
For questions or concerns please contact CPFM Design and Construction Owners Rep Denise Stewart at 541-335-1258.