UPDATE: The heating system at Peterson has been repaired and brought back online.
Begin: Tuesday, March 18, 2025 – effective immediately
End: unknown Tuesday, March 18, 2025
Building(s) or Area(s) Affected: Peterson Hall
Scope: A power outage caused by a chilled water leak damaged the Variable Frequency Drive that powers the heating system water pump. A replacement part has been ordered and will be installed as soon as possible. An update will be sent out when heating has been restored to the building.
Services Impacted: Heating will be unavailable to all Peterson Hall until repairs can be made.
Work Performed By: CPFM BAS Crew
Contact: Stacy Breaux, CPFM FS Building Automation Systems Field Supervisor, 541-346-2304
Work Control Center, Campus Planning and Facilities Management, 541-346-2319
Current construction and impacts information can be found on the UO Maps site.
