4/1/24 Huestis Hall and Lokey Labs Electrical Distribution System Testing Advisory

Begin:  Monday, April 1, 2024, at 11:00 am

End:      Monday, April 1, 2024, at 12:00 noon

Building(s) or Area(s) Affected:  Huestis Hall and Lokey Labs

Scope:  EC Electric will conduct a closed transition test on the main electrical distribution system.

Services Impacted:  No impacts are expected, but there is a slight chance of a full electrical outage.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  EC Electric

ContactMartina Oxoby, CPFM Owner’s Representative, 541-346-5880

Current construction and impact information can be found on the UO Maps site.

Huestis and Lokey Labs Overhead Map