Begin:   Wednesday, March 20, 2024 at 8:00 am

End:      Wednesday, March 20, 2024 at 4:00 pm

Building(s) or Area(s) Affected:  Pacific Hall

Scope:   The lab vacuum pump system will need to be shut down to allow a contractor to perform a repair and complete preventive maintenance on the vacuum pump system located in the penthouse.  It is necessary to take the system offline while the contractor is performing work on the vacuum pumps.

Services Impacted:  This will affect all rooms and equipment connected to the building vacuum system in Pacific.

Work Performed By:  Roger’s Machinery

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.