Begin: Wednesday, December 20, 2023, at 7:30 am
End: Wednesday, December 20, 2023, at 12:00 noon
Building(s) or Area(s) Affected: New Walton (B&C) and Hayward Field.
Scope: To upgrade the electrical service to the new Walton, all standby power (only) will be down to the new residence hall buildings B&C and Hayward Field.
Services Impacted: Regular power will not be affected during this shutdown.
Special Instructions: Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on. A power surge can corrupt the clone files in the machines and change preconfigured settings. For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu. For non-copier questions, please reach out to the contact person listed below.
Work Performed By: OEG
Contact: David Mason, CPFM Owner’s Representative, 541-346-5679
Current construction and impacts information can be found on the UO Maps site.