12/10/22 Unexpected power outage impacting Klamath Hall and Onyx Bridge

UPDATE – #2 12/10/22 at 6:05 pm:

The power has been restored. Power is on in a single-ended condition. Power is currently being fed from feeder 10.

A contractor will be out as soon as Utilities and Energy can get them to campus to evaluate the switch.

UPDATE – 12/10/22 at 4:44 pm:

The power outage has been determined to impact all floors of Klamath Hall, including fume hoods.  Facilities and Utilities and Energy are on site. EH&S is aware and working with CPFM personnel. The Utilities and Energy Electrical supervisor is on site. The hope is to have the power restored in 3-4 hours.  The Building Automation (BAS) and Mechanical Teams are on site, ready to support the restore.

INITIAL EVENT NOTICE 12/10/22 at 2:08 pm: 

Parts of Klamath Hall and Onyx Bridge lost electrical power today (December 10). This resulted in various security and other alarms being triggered. UOPD responded to ensure the security of the facility, and Facilities Services electricians are onsite for assessment and restoration of the power situation.

The power outage is currently impacting the following:

  • Klamath Hall Basement, 1st and part of 2nd Floor
  • Onyx 1st Floor

The restore ETA is still TBD, but teams hope to achieve a power restoration by evening hours today. A restore message will be sent as soon as services are restored.