Begin: Tuesday, July 5th, 2022 at 5:00 am
End: Wednesday, July 6th, 2022 at 5:00 pm
Building(s) or Area(s) Impacted: Road between ZIRC and Millrace Studio 3. From 3A lot spaces 1-15
Scope: The road will be closed between ZIRC and the Millrace Studios to support a construction project.
Services Impacted: Access will be blocked off during this time, but this may take less time than expected
Special Instructions: A detour is available on the north side of the CPFM Administration Quonset or access can be obtained from the east via Riverfront Parkway.
Work Performed By: Fortis Construction
Contact: Colin Brennan, CPFM Owner’s Representative, 541-346-8242 or 541-654-2972