Carson Hall Electrical Shutdown 12/21/20

Begin:  Monday, December 21, 2020, at 8:00 am

End:      Monday, December 21, 2020, at 4:00 pm

Building Impacted:  Carson Hall

Scope:  Due to a leaking bushing on the medium voltage side of the transformer, the power will be de-energized for 8 hours while a contractor makes repairs.

Services Impacted:  The entire building will be without 208 volt power.

Special Instructions:  Please shut down all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when power is turned back on, a power surge can corrupt the clone files in the machines, and can change preconfigured settings.

Work Performed By:  CPFM Utilities & Energy and contractor

ContactRick Tabor, CPFM Interim Co-Dir Utilities and Facilities Management, 541-346-7511