June 23, 2016

Published on: Author: mbean@uoregon.edu Leave a comment

The best part of yesterday’s hard-hat tour was seeing the installation of the Douglas fir paneling in the ceiling of the social commons and along on the south wall of both floors of the library.   The circulation office has been glassed in. The makerspace has been glassed in. Several of the public laptop re-charge… Continue reading

PSC Update – March 22, 2016

Published on: Author: mbean@uoregon.edu Leave a comment

The perimeter structural walls upstairs are about 20% complete. The interior walls upstairs (cafĂ© and restroom) are about 80% complete. Construction crews are preparing to install the remaining storefront glass around the atrium downstairs. The spring break project of fireproofing the column in phase II near the geology room is underway. Cement for the new… Continue reading

PSC Update – March 4, 2016

Published on: Author: mbean@uoregon.edu Leave a comment

The new men’s and women’s restrooms downstairs in the academic commons now have roughed in walls (the one restroom upstairs in the social commons will be gender-neutral). The elevator should be finished by mid-April. The roof should be completed by the end of March. The atrium is currently being excavated, including digging channels for plumbing… Continue reading