We are set to complete Phase II of construction by the time school starts in the fall. Phase II includes the large and small group study rooms, the quiet study room, the book stacks, and the department study rooms. Except for Human Physiology and Computer Science, the department rooms will serve as general computer labs until Phase III is finished in July 2016. The picture on the left below shows the Physics department study room. The panels on the inset cabinets are made of white board material. The back wall of each of the department rooms is painted a different color to match a subject-related graphic that will be adhered to the wall next to the door of the room. The first picture below shows the Physics department room. The second image below shows the the bamboo end panels for the book stacks.