This week study room walls were framed, dry walls were installed in some study rooms, carpeting continued in the book area, and major headway was made on strengthening the plaza. Also, the new (non-orange) shelving has arrived! It is estimated that it will take about two weeks to get it all installed. The picture below shows the carpeted book area with a heavy plywood “runway.” The new shelving will be rolled into the book area on the runway and then assembled on the big plywood square. 009