8/29/25 – Unknown McKenzie Hall AHU-5 Emergency Shutdown
Posted on

Begin:  Friday, August 29, 2025 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  McKenzie Hall

Scope:  AHU-5 has been shutdown for an emergency repair.

Services Impacted:  The North end of the 2nd and 3rd floors will have no heating or cooling until the repair is completed.  An update will be sent when an expected completion date is determined.

Work Performed By:  CPFM BAS and Mechanical Crews

ContactShaun Frasier, CPFM Plumbing and Mechanical Shop Manager, 541-346-0275

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

McKenzie Hall on the map

9/02/25 – 9/09/25 and 11/18/25 – 1776 Millrace Exterior Window Preventative Maintenance Work Advisory
Posted on

UPDATE 11/17/25:
Culver Glass has rescheduled this for tomorrow, Tuesday, November 18th, starting at 8:00 am.

UPDATE 11/13/25:
Culver Glass just informed us that this has been postponed due to some emergency work and the weather.  The new date is yet to be determined.

UPDATE 11/12/25:
Culver Glass will be performing a second round of work on the exterior windows tomorrow 11/13 and Friday 11/14.

 

Begin: Tuesday, September 2, 2025

End:   Tuesday, September 9, 2025

2nd RoundNovember 13 & November 14     Tuesday, November 18, 2025

TBD

Building(s) or Area(s) Affected: 1776 Millrace

Scope: Culver Glass will be performing preventative maintenance on the exterior windows.

Services Impacted:

  • Occupants can expect to see contractors using ladders, scaffolding or lifts to scrape and caulk the windows around the building exterior.
  • All work will be performed outside the building and no other impacts are anticipated.

Work Performed By: Culver Glass

Contact: Justin Grishkin, CPFM Construction Services Manager, 541-346-5242 or 541-510-0143

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of 1776 Millrace

8/28/25 – 8/29/25 Unthank Hall Emergency Steam Shutdown
Posted on

UPDATE:  The repair has been completed, and steam is now being returned to the building.  It may take several hours before full building heat and hot water are available.

Begin:  Thursday, August 28, 2025 – effective immediately

End:      Friday, August 29, 2025, at 12:00 noon

Building(s) or Area(s) Affected:  Unthank Hall

Scope:  Steam has been turned off for an emergency leak repair.

Services Impacted:

  • No building heat or hot water will be available until the repair is complete.
  • Minimal impact is expected as catering is currently shutdown at this time.

Work Performed By:  CPFM Utilities & Energy

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Unthank Hall

9/1/25 – 9/26/25 Campus Fire Systems Testing and Maintenance Schedule for Summer 2025
Posted on

UPDATE 9/19/25:
On Wednesday, September 24th, fire systems testing and maintenance will take place at Alder Building instead of 1776 Millrace.

 

Begin:  Monday, September 1, 2025

End:     Friday, September 26, 2025

Scope:   Summer 2025 Fire Systems Testing and Maintenance has been scheduled for the various campus buildings listed below.  Reminders will be sent to each building prior to testing.

Week of 9/01 – 9/05
Monday – 9/01              No testing – Labor Day
Tuesday – 9/02           8:00 am – 3:00 pm – Global Scholars Hall
Tuesday – 9/02           9:00 am – 3:00 pm – Unthank Hall Kitchen
Wednesday – 9/03      6:00 am – 3:00 pm – Global Scholars Hall
Wednesday – 9/03      6:00 am – 3:00 pm – Unthank Hall Kitchen
Thursday – 9/04         6:00 am – 8:00 am – CPFM Warehouse
Thursday – 9/04         7:00 am – 12:00 noon – Kalapuya Ilihi
Thursday – 9/04         8:00 am – 3:00 pm – Global Scholars Hall
Thursday – 9/04         6:00 am – 3:00 pm – Unthank Hall Kitchen
Friday – 9/05              8:00 am – finished – Global Scholars / CPFM Makeup/Repair

Week of 9/8 – 9/12
Monday – 9/08            6:00 am – 8:00 am – TBD
Monday – 9/08            8:00 am – 3:00 pm – Kalapuya Ilihi
Tuesday – 9/09            6:00 am – 9:00 am – Ford Alumni Center
Tuesday – 9/09            8:00 am – 3:00 pm – Kalapuya Ilihi
Wednesday – 9/10       6:00 am – 9:00 am – Erb Memorial Union
Thursday – 9/11            6:00 am – 8:00 am – Kalapuya Ilihi
Friday – 9/12

Week of 9/15 – 9/19
Monday – 9/15
Tuesday – 9/16            6:00 am – 9:00 am – Jordan Schnitzer Museum of Art
Wednesday – 9/17       6:00 am – 9:00 am – Jaqua Academic Center
Thursday – 9/18          6:00 am – 8:00 am – EC Cares (W. 12th Ave.)
Friday – 9/19

Week of 9/22 – 9/26
Monday – 9/22
Tuesday – 9/23           6:00 am – 9:00 am – 1600 Millrace
Wednesday – 9/24     6:00 am – 9:00 am – 1776 Millrace   Alder Building
Thursday – 9/25         6:00 am – 8:00 am – TBD
Friday – 9/26

Details: Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.

Special Instructions: If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations

Work Performed By: UO Safety & Risk Services

Contact: Zach Earl, UO Fire Protection Manager, 541-521-0351 or 541-346-9295.

Current construction and impacts information can be found on the UO Maps site.

 

9/08/25 – 9/09/25 Jordan Schnitzer Museum of Art North Courtyard Art Installation Advisory
Posted on

Begin:  Monday, September 8, 2025, at 7:00 am

End:      Tuesday, September 9, 2025, at 7:00 am

Building(s) or Area(s) Affected:  Jordan Schnitzer Museum of Art, Susan Campbell, and Tykeson Hall

Scope:  One large-scale sculpture will be installed in the JSMA’s North Courtyard.

Services Impacted:

  • Access to the JSMA’s parking lot (including one ADA parking spot), loading dock, security entrance, bike cage, trash collection, north courtyard, north sidewalk, and the west side of Susan Campbell Hall will be limited during crane work operations (7:00 am – 5:00 pm).
  • Crane staging and art crating will be located in the JSMA’s parking lot.
  • There will be limited access to the west end of Johnson Lane.

Work Performed By:  Artech, Ness Campbell, and JSMA staff

Contact:  Alexander Ellis, Jordan Schnitzer Museum of Art, 541-346-0876

Current construction and impacts information can be found on the UO Maps site.

Diagram of Jordan Schnitzer's Museum of Art security perimeter for an art installation on 9/08/25 - 9/09/25

8/28/25 Baker Downtown Center Emergency Steam Shutdown
Posted on

UPDATE:
The steam trap repair has been completed, and the steam has been restored.

 

Begin:  Thursday, August 28, 2025, at 8:00 am

End:      Thursday, August 28, 2025 – unknown  10:00 am

Building(s) or Area(s) Affected:  Baker Downtown Center

Scope:  The building steam will be shut down for an emergency repair to a steam trap in room 60B.  An update will be sent when the steam has been restored.

Services Impacted:  Building heat will be offline during this time.

Work Performed By:  CPFM Mechanical Crew

ContactShaun Frasier, CPFM Plumbing and Mechanical Shop Manager, 541-346-0275

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Baker Downtown Center

8/26/25 Huestis Hall Vacuum Pump Emergency Shutdown
Posted on

UPDATE:
The vacuum pump has been repaired.

 

Begin:  Tuesday, August 26, 2025 – effective immediately

End:      Tuesday, August 26, 2025 – approximately 11:30 am

Building(s) or Area(s) Affected:  Huestis Hall

Scope:  The vacuum pump has been shut down for an emergency repair.  An update will be sent when it has been restored to service.

Services Impacted:  All lab vacuums will be offline in the building.

Work Performed By:  CPFM Crews

ContactShaun Frasier, CPFM Plumbing and Mechanical Shop Manager, 541-346-0275

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Huestis Hall

8/29/25 Portland East Residence Hall Electrical Outage
Posted on

Begin:  Friday, August 29, 2025, at 8:00 am

End:      Friday, August 29, 2025, at 2:00 pm

Building(s) or Area(s) Affected:  Portland East Residence Hall

Scope:  Power will shut off to the East Residence Hall to allow Pacific Power to install a protective device on the power pole to help prevent electrocution of birds and small animals.

Services Impacted:  There will be no power in the building, so computers and wireless connections will not be functioning, nor will elevators and portable air conditioners that serve the few occupied offices in the East Residence Hall.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  Pacific Power

ContactDane Bevan, UO Portland AD Facilities Services, 503-412-0470

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Portland East Residence Hall

8/26/25 – 8/29/25 Willamette Hall Window Washing Advisory
Posted on

Begin:  Tuesday, August 26, 2025, at 6:00 am

End:      Friday, August 29, 2025, at 2:30 pm

Building(s) or Area(s) Affected:  Willamette Hall

Scope:  Exterior window cleaning of select areas to include the south entryway, east entryway, and the windows on the 1st and 2nd floors that are reachable from the ground by pole.

Services Impacted:  No services are expected to be impacted.

Special Instructions:  Please keep all windows closed for the duration of this work.

Work Performed By:  CPFM Custodial Staff

ContactNick Grant, CPFM Custodial Operations Supervisor, 541-346-2294

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of Willamette Hall

8/25/25 – 8/26/25 Prince Lucien Campbell Hall Window Washing Advisory
Posted on

Begin:  Monday, August 25, 2025, at 6:00 am

End:      Tuesday, August 26, 2025, at 2:30 pm

Building(s) or Area(s) Affected:  Prince Lucien Campbell Hall

Scope:  Exterior window cleaning, primarily select areas on first floor to include entries around hallway 180 and courtyard windows.

Services Impacted:  No services are expected to be impacted.

Special Instructions:  Please keep all windows closed for the duration of this work.

Work Performed By:  CPFM Custodial Staff

ContactNick Grant, CPFM Custodial Operations Supervisor, 541-346-2294

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Prince Lucien Campbell

9/01/25 – 9/30/25 Campus Air Handling Unit Preventative Maintenance Schedule for September 2025
Posted on

Begin:  September 1, 2025

End:     September 30, 2025

Building(s) or Area(s) Impacted:

  • Lewis integrative Science Building
  • Zebrafish International Resource Center
  • Volcanology Hall
  • Deschutes Hall
  • Miscellaneous Quonset #131
  • Paint Quonset #129
  • Quonset #108
  • CPFM Warehouse/FASS Stores
  • CPFM Administration Quonset
  • Millrace Studio 1
  • Millrace Studio 2
  • Millrace Studio 3

Scope:  AHU preventative maintenance work is scheduled to be performed, over the course of the month, for the buildings listed above.

Services Impacted:  No services are expected to be impacted.

Work Performed By:  CPFM Preventative Maintenance Crew or Contractor

ContactShaun Frasier, CPFM Plumbing and Mechanical Shop Manager, 541-346-0275

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of buildings affected by the Campus Air Handling Unit Preventative Maintenance Schedule for September 2025

8/22/25 – Unknown – Museum of Natural and Cultural History Intermittent Humidity Issues
Posted on

Begin:  Friday, August 22, 2025 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Museum of Natural and Cultural History

Scope:  The chilled loop is experiencing intermittent issues affecting the humidity levels.  A contractor is being called in now to address the problem.

Services Impacted:  Humidity levels are fluctuating in the whole building, except for special collections.

Work Performed By:  CPFM Crews and Contractor

ContactShaun Frasier, CPFM Plumbing and Mechanical Shop Manager, 541-346-0275

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the Museum of Natural and Cultural History

8/22/25 – 8/25/25 Oregon Hall Elevator #1 Emergency Shutdown
Posted on

UPDATE:
The elevator has been restored to service.

 

Begin:  Friday, August 22, 2025 – effective immediately

End:      Unknown     Monday, August 25, 2025

Building(s) or Area(s) Affected:  Oregon Hall

Scope:  The west elevator is down for emergency repairs.  An update will be sent when it has been returned to service.

Services Impacted:  Elevator #1 (west) is offline.  Please use elevator #2 (east), which is next to it. (see map below)

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis Elevator

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Oregon Hall's West Elevator #1

8/21/25 – Unknown – Carson Hall Kitchen Freight Elevator Emergency Shutdown
Posted on

Begin:  Thursday, August 21, 2025 – effective immediately

End:      Unknown

Building(s) or Area(s) Affected:  Carson Hall Kitchen Freight Elevator

Scope:  The elevator is down for an emergency repair.  Parts are currently being ordered.  An update will be sent when it has been restored to service.

Services Impacted:  The kitchen’s freight elevator will be offline during this time.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of the kitchen freight elevator in Caron Hall

9/02/25 – 11/21/25 CPFM Administration Quonset 2nd Floor Remodeling Advisory
Posted on

UPDATE #2  10/30/25:
Tomorrow, Friday, October 31st, Air Inc. will be balancing the HVAC system for both the 1st and 2nd floors. They will be in each room at least twice and potentially up to four times.
– Also, the completion date has been extended to Friday, November 21st.

UPDATE #1 10/30/25:
The contractor just informed us that he will be cutting some metal tabs in the wall upstairs.  It is expected to be very loud.  Depending on the type of metal they are made of will determine how long the noise will last, potentially up to 30 minutes.

UPDATE 10/24/25:
UO Network Services has installed one of the new wireless access points outside of room 104 but will get the remaining two in next week, between Monday, 10/27/25 and Thursday, 10/30/25.

UPDATE 10/20/25:
UO Network Services will be installing three (3) new wireless hubs on the first floor outside of rooms 104 and 120 as well as in the main lobby near the reception desk.

  • Workers will not be in the area the entire duration.
  • The dates and times given are a window when Network Services could be performing work.
  • There may be some noise and passageways could be blocked.

UPDATE 10/14:
The contractor will begin cutting into the roof for the two new skylights.  Loud noise can be expected for roughly an hour and half.  They are planning to start by 10:30 am.

UPDATE 10/01:
Steam / chilled water lines will be replaced in rooms 210A, 210, and 212.
There should be no impact to the heating / cooling in the rest of the building.
There will be construction noise associated with the pipe replacement and increased foot traffic in the building.
Work will be done by Harvey & Price and Preferred Construction.

UPDATE 9/15:
The contractor just notified us that they will begin staging today near the south side of the building, by the picnic table.  It is also expected that the construction noise levels will begin to elevate in the building, potentially this afternoon.

UPDATE 9/04:
Abatement work will begin on Tuesday, September 9th at 8:30 am and will end on Friday, September 12th at 3:30 pm.
Work will be performed by Asbestos Abatement Contracting, LLC.

UPDATE 8/29:
BELCO Electric will begin removing electrical and conduit this afternoon 8/29/25.  The abatement work has been postponed and will now begin Monday, September 8, 2025 at 8:00 am.

UPDATE 8/26:
Campus Planning is relocating to Rainier during the renovation of their space on the 2nd floor of Building #136. Moving will occur Thursday, August 28th from 8:00 am to 12:00 noon.  Please expect increased activity at both sets of stairs in the Quonset.

 

Begin:  Tuesday, September 2, 2025, at 7:00 am

End:      October 31   Friday, November 21, 2025, at 5:00 pm

Building(s) or Area(s) Affected:  CPFM Administration Quonset

Scope:  Campus Planning’s space on the 2nd floor of Building #136 is being remodeled. We are building two offices on the east side of room 212. Two new skylights will be installed in the new offices.

Services Impacted:  Construction noise is to be anticipated throughout the building for the duration of the project.

Work Performed By:  Preferred Construction

ContactRenee Benoit, CPFM Owner’s Representative, 541-346-5080

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of CPFM Administration Quonset room 212

8/21/25 McKenzie Hall Heating Water Emergency Shutdown
Posted on

UPDATE:
The heating hot water has been restored to service.

 

Begin:  Thursday, August 21, 2025 – effective immediately

End:      Thursday, August 21, 2025 – later this afternoon

Building(s) or Area(s) Affected:  McKenzie Hall

Scope:  The heating hot water has been shut down for an emergency repair.  It is expected to be restored sometime this afternoon.  An update will be sent when it is operational again.

Services Impacted:  Building heat will be offline during this time.

Work Performed By:  CPFM Crews

ContactShaun Frasier, CPFM Plumbing and Mechanical Shop Manager, 541-346-0275

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of McKenzie Hall

8/27/25 – 9/14/25 SRC Window Washing Advisory
Posted on

Begin:  Wednesday, August 27, 2025, at 2:00 pm

End:      Sunday, September 14, 2025, at 8:00 pm

Building(s) or Area(s) Affected:  Student Recreation Center

Scope:  Exterior window cleaning will be taking place.

Services Impacted:  No services are expected to be impacted.

Special Instructions:  Please keep all windows closed for the duration of this work.

Work Performed By:  CPFM Custodial Staff

ContactMichael Philley, CPFM Custodial Operations Supervisor, 541-346-2294

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

SRC on the map

8/20/25 – 8/21/25 Klamath Hall Window Washing Advisory
Posted on

Begin:  Wednesday, August 20, 2025

End:      Thursday, August 21, 2025

Building(s) or Area(s) Affected:  Klamath Hall

Scope:  The exterior windows of the building will be washed.

Services Impacted:  No services are expected to be impacted.

Special Instructions:  Please keep all windows closed for the duration of this work.

Work Performed By:  CPFM Custodial Staff

ContactMichael Philley, CPFM Custodial Operations Supervisor, 541-346-2294

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Klamath Hall

9/03/25 Millrace Parking Garage Electrical Outage
Posted on

Begin:  Wednesday, September 3, 2025, at 7:00 am

End:      Wednesday, September 3, 2025, at 8:00 am

Building(s) or Area(s) Affected:  Millrace Parking Garage

Scope:  The surge suppressor in panel 1S1-2 will be replaced.

Services Impacted:  The power outage will affect elevator cab lights, Siemens control, fire panel, fire sprinkler air compressor, DAS, Rooms 105 and 401, and the data racks.

Work Performed By:  OEG, Inc.

ContactRob Berg, CPFM Electrical Supervisor, 541-346-2313

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of the Millrace Garage

9/04/25 Pacific Hall Electrical Outage
Posted on

Begin:  Thursday, September 4, 2025, at 7:00 am

End:      Thursday, September 4, 2025, at 8:30 am

Building(s) or Area(s) Affected:  Pacific Hall

Scope:  Surge suppressor panels 2E1-2 and BE1-2 will be replaced.  Power will be off for up to 1.5 hours.

Services Impacted:

  • This will affect fire smoke dampers #8-#11, the fire alarm power supply, the 1st, 2nd, & 3rd floor hall lights, and the freezer room duct detector.
  • The elevator will still be operational during this outage.

Special Instructions:  Please shut down and unplug all multi-function copier devices as well as any printers during scheduled power outages. The software on these machines can be negatively affected due to the power surge when the power is turned back on.  A power surge can corrupt the clone files in the machines and change preconfigured settings.  For questions, please contact Kati Kronholm at 541-346-5370 or katik@uoregon.edu.  For non-copier questions, please reach out to the contact person listed below.

Work Performed By:  OEG, Inc.

ContactRob Berg, CPFM Electrical Supervisor, 541-346-2313

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of Pacific Hall

8/19/25 – 8/20/25 Pacific Hall Emergency Elevator Shutdown
Posted on

UPDATE:
The elevator has been repaired and returned to service.

 

Begin:  Tuesday, August 19, 2025 – effective immediately

End:      Wednesday, August 20, 2025 – unknown

Building(s) or Area(s) Affected:  Pacific Hall

Scope:  The elevator is down for an emergency repair.  An update will be sent when it has been restored to service.

Services Impacted:  The elevator will be offline during this time.  Please use the west elevator in Onyx Bridge or the stairs.

Special Instructions:  If you have concerns about accessing your workplace when elevator services are impacted, please contact your supervisor to find an appropriate accommodation.

Work Performed By:  Otis

ContactWork Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of elevator locations in Pacific Hall and Onyx Bridge

8/22/25 South Side of Straub Hall and Earl Hall Boom Lift Activity and Egress Advisory
Posted on

Begin:  Friday, August 22, 2025, at 8:00 am

End:      Friday, August 22, 2025, at 3:30 pm

Building(s) or Area(s) Affected:  Walkway between Straub and Young Hall on the South end of Straub.

Scope:  We will be pulling our boom lift into the egress walkway on the south end of Straub Hall to reach gutter downspouts inside the south courtyard.  We will be working above the S196 stairwell exit on the downspout collection boxes.

Services Impacted:  There will be no egress in or out of the south Straub courtyard on this walkway.

Work Performed By:  CPFM Maintenance Support

ContactGabe Hein, CPFM Maintenance Support Supervisor, 541-346-7563

Work Control Center, Campus Planning and Facilities Management, 541-346-2319

Current construction and impacts information can be found on the UO Maps site.

Overhead aerial view of section of sidewalk closed between Straub Hall and Earl Hall (Young Hall) plus map showing location of Stairwell 196

8/18/25 – 8/22/25 Prince Lucien Campbell Roof Concrete Drilling Noise Advisory
Posted on

UPDATE:
Additional intermittent noise is to be expected as they are currently erecting the antenna over the next two weeks.

 

Begin:  Monday, August 18, 2025, at 7:30 am

End:      Friday, August 22, 2025, at 5:00 pm

Additional Antenna Work:  Tuesday, September 2, 2025, through Friday, September 12, 2025

Building(s) or Area(s) Affected:  Prince Lucien Campbell

Scope:  Contractor will be installing a new antenna base which requires drilling into concrete on the roof.

Services Impacted:  This will cause intermittent noise in the building.

Work Performed By:  Preferred Construction

ContactBruce Budzik, CPFM Small Projects & Capital Improvement Manager, 541-346-8834

Current construction and impacts information can be found on the UO Maps site.

Aerial view of Prince Lucien Campbell

8/21/25 – 1776 Millrace Fire System Testing Advisory
Posted on

Begin:  Thursday, August 21, 2025, at 6:00 am

End:      Thursday, August 21, 2025, at 8:00 am

Building(s) or Area(s) Affected:  1776 Millrace

Scope:  As part of the ongoing construction work by Swinerton Construction, the building’s fire alarm system will be tested on Thursday.

Services Impacted:

  • Initial Testing:  The alarm will sound for approximately 5–10 minutes at the start of testing.
  • Additional Testing:  Intermittent alarms may occur throughout the two-hour period.
  • Alarm Details:  Horns, strobes, and speakers will be active during testing and will be loud throughout the building.

Additional Details:  Horns, Strobes, and Speakers on the fire alarm system will not sound after the scheduled time. Provisions have been taken to monitor the building fire systems during this time and alarms that occur after the scheduled time should be considered real events and occupants should evacuate as usual per the U of O Emergency Procedures.  Thank you for your understanding and cooperation.

Special Instructions:  If there are questions regarding emergency evacuation, please visit Emergency Management & Continuity, https://safety.uoregon.edu/evacuations.

Work Performed By:  Swinerton Company & IES

ContactWaymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of 1776 Millrace (formerly known as 1700 Millrace)

8/25/25 – 9/2/25 – 1776 Millrace 2nd and 3rd Floor Restroom Painting Advisory
Posted on

UPDATE:

This work has been extended and will now be completed on Tuesday, September 2, 2025.

Begin:  Monday, August 25, 2025, at 7:00 am

End:      Friday, August 29, 2025, at 4:00 pm Tuesday, September 2, 2025 at 4:00 pm

Building(s) or Area(s) Affected:  1776 Millrace

Scope:  As part of the 1776 Millrace renovation project, Swinerton Contractor will be painting the walls and ceilings of the women’s and men’s group restrooms on the second and third floors. The work will be staggered to allow access. The second-floor women’s and men’s group restrooms are scheduled for August 25 and 26. The third-floor women’s and men’s group restrooms are scheduled for August 28 and 29.

Services Impacted:  Access to the facilities will be restricted during the scheduled time.

Work Performed By:  Swinerton Company

ContactWaymon Banks, CPFM Owner’s Representative, 541-346-0196

Current construction and impacts information can be found on the UO Maps site.

Overhead map view of 1776 Millrace (formerly known as 1700 Millrace)