UPDATE 12/14/22:
The system is currently online and running in it’s designed emergency mode, circulating city water. On Thursday morning 12/15/22 the system will be placed back into normal operating mode. A contractor will be testing and adjusting the system water flows 12/20/22 – 12/22/22 but they will not impact the operation of the system or cause any shutdowns.
UPDATE 12/13/22:
TAB contractors will be onsite 12/20/22 – 12/22/22 to test and adjust the system. They will be accessing all rooms with process water manifolds.
UPDATE 12/12/22:
CPFM will be coming through each lab that has a process water connection to ensure that the valves are in the correct position for flushing the system. This work should take place Tuesday and Wednesday afternoons of this week.
Begin: Monday, December 12th, 2022
End: Friday, December 16th, 2022 Thursday, December 15th, 2022
Building(s) or Area(s) Affected: Willamette, Klamath, Lokey Labs, LISB
Scope: The processed chilled water system will be shut down for work associated with improving system operation and redundancy.
Services Impacted: All equipment connected to system should be disconnected until construction is complete and the water has been flushed.
This will affect:
- Willamette: Rooms 39, 41C, 42, 74C, 154, 242, 255, 256, 272, 273
- Klamath: Rooms 61B, 62, 63
- LISB: 003, 004A, 004B, 004C, 004D, 018, 201E
- Lokey Labs: 053A, 063, 073, 073A, 080, 083A, 083A, 087A, 096A, 097A
Work Performed By: S2 Industrial
Contact: Kevin Waldrop, CPFM Facilities Engineer, 541-346